Asbestos Testing Before Replacing Older Flooring

A flooring project can expose more than the surface you see. Layers underneath may include older tile, backing or adhesive. If you are concerned that a material could contain asbestos, pause plans to sand, cut or scrape it and discuss the work with a qualified inspector.

Describe the layers without exposing them

Gather photos of accessible surfaces, records of earlier floor replacements, and your contractor’s scope. Point out transitions or areas where a layer is already visible. Do not pull up a corner or scrape adhesive for a better look. Appearance alone cannot confirm whether a material contains asbestos.

Ask whether each suspect material is in scope

Tile, backing and adhesive are separate materials. An inspector can decide what needs to be evaluated based on the work proposed and accessible conditions. Ask which areas or materials will be included, how they will be identified in the report, and what happens if a layer cannot be accessed without further work.

Share findings before the project starts

Keep the written report with the planned work scope. Ask the contractor to review the relevant locations and limits before scheduling demolition or removal. If the plan changes to include a different room or a new layer is found, check whether the original inspection covers it. Results for one material should not be assumed to apply to a different one.

Further reading: EPA guidance on suspect asbestos materials.

Need help choosing an inspection in the Waukesha or Lake Country area? Learn about Elite Indoor Air’s asbestos inspection and testing or call (262) 205-1564. Describe the suspect material and any planned work.